Click here for overview
Click here for Assessing
Click here for Building Department
Click here for Lakeview Cemetery and Sashabaw Plains Cemetery
Click here for Facilities Maintenance Department
Click here for Fire Department
Click here for Library
Click here for Parks and Recreation
Click here for Police Department
Click here for Public Works
Click here for Township Clerk
Click here for Township Supervisor
Click here for Township Treasurer
 
 
 
Independence Township, 6483 Waldon Center Drive, Clarkston, MI  48346  248-625-5111

 

 

 

Township Services

Public Works

Overview  |  Backflow Prevention  |  Brush  |  Sewer Installation
Water Installation  |  Drinking Water  |  Energy Challenge  |  Environmental News 
Green Triangle Communities EECBG  |  Recycling  |  Water and Sewer 
Water Packet    

Basic Requirements for Sewer Installation

Types of approved sewer pipe:

  • Storm Sewer (sump pump leads) - minimum 3” Schedule 40 P.V.C.
  • Sanitary Sewer Leads – 4” minimum from property line to house, minimum of 6” in road right-of-way.  SDR 23.5, Schedule 40 P.V.C., ABS plastic, SDR 35 P.V.C. (in sandy conditions only).

All pipes shall have the marking of an approved testing agency, such as N.S.F., A.S.T.M., etc.

  • Cleanout placement:
  • Cleanouts shall be installed immediately inside or outside of the building.
  • Cleanouts shall be installed at a minimum of every 90 feet or such that the total distance, including the cleanout riser and sewer lead, does not exceed 100 feet.
  • All outside cleanouts shall be brought up to finish grade.
  • Cleanouts shall be installed at every change of direction greater than 45 degrees. 
    (90 degree elbows are prohibited).

All sewer leads will be a minimum of four (4) inches in diameter with 42” of cover.  All taps shall be made with approved Fernco fitting, or approved equal.

ALL TAPS AND LEADS MUST BE  INSPECTED AND AP PROVED BY THE SEWER DEPARTMENT INSPECTORS, BEFORE BEING COVERED.

ALL EXCAVATORS AND CONTRACTORS TAPPING SEWER MAINS SHALL BE BONDED WITH INDEPENDENCE TOWNSHIP.  MUST CARRY A $5,000 SURETY BOND AND A $500 CASH BOND.

Existing homes with septic systems connecting to the township sanitary sewer system must:

  1. Drain tank
  2. Fill with sand or crush tank
  3. Must call Charter Township of Independence Department of Public Works for inspection, 248-625-8222

 

 

 

 

 

 

 

Independence Township Signature
our community | our government | township departments | reference desk | employment | mailing list
search | site map | contact us | home
Site Design and Development by
Bringing the World to Your Corner of the World
This page last updated: May 01, 2011
All information ©2011 Charter Township of Independence
Click here for our Site Use Policy