header
Charter Township of
Independence Click here to go Home Click here to Search Click here for Site Map Click here to Contact Us New Page 1
menu-image
Click here for Community Click here for Government Click here for Services Click here for Reference Desk Click here for Employment Opportunities Click here to subscribe to our Mailing List
Services Secondary Menu
Click here for overview
Click here for Assessing
Click here for Building Department
Click here for Lakeview Cemetery and Sashabaw Plains Cemetery
Click here for Facilities Maintenance Department
Click here for Fire Department
Click here for Library
Click here for Parks and Recreation
Click here for Police Department
Click here for Public Works
Click here for Township Clerk
Click here for Township Supervisor
Click here for Township Treasurer
 
 
 
Independence Township, 6483 Waldon Center Drive, Clarkston, MI  48346  248-625-5111

 

 

 

Township Services

Public Works

Overview  |  Backflow Prevention  |  Brush  |  Sewer Installation
Water Installation  |  Drinking Water  |  Energy Challenge  |  Environmental News 
Green Triangle Communities EECBG  |  Recycling  |  Water and Sewer 
Water Packet    

Water and Sewer

The Water Department is updating to a new type of water meter that does not require an outside reader.  This meter has an electronic transmitter, which sends the reading via radio waves to a hand-held receiver.  We are first installing this new system in homes that currently do not have an outside reader and in homes where we are experiencing trouble getting reads from the outside reader.  Eventually, every home on our system will have this new meter.  If you would like one installed in your home now, please call 248-625-8222 for an appointment.  We can schedule a specific time to the there, at your convenience.

It is illegal to use fire hydrants - Please call us at 248-625-8222 if anyone is seen using a hydrant.

Notice!  Irrigation System Owners

State and Federal Law mandates that you have a backflow device if you have an irrigation system.  This device is to be tested annually, with the test results submitted to the DPW.  For a list of approved testers, call 248-625-8222.  If your plumber is not on the list have him call us.  All new irrigation system installations require a plumbing permit from the Building Department.

Sewer Backup Legislation

On January 2, 2002, Public Act 222 of 2001 came into effect.  This new state law provides procedures that need to be followed in the event of a sewage overflow or backup on your property.  If you intend to file a claim for damages due to a sewage overflow or backup on your property, you must provide the Township of Independence Clerk Barb Pallotta with the following information, in writing, within 45 days of the date the sewer overflow or backup was discovered or should have been discovered:

  • Your name, address, and telephone number
  • The address of the affected property
  • The date any property damage was discovered or physical injury occurred
  • A brief description of the events and your claim

Failure to provide this information within 45 days of the date the damage or physical injury was discovered or should have been discovered will prevent you from being able to make a claim against the Charter Township of Independence for economic damages.

Rates
Procedure for Final Bills

Rates - Effective November 16, 2010

(Back to Top)

To help you read your residential water/sewer usage bill.

Water
Codes 10-14 = Water consumption $ 1.89 per 100 cubic feet of water
Codes 20-21 = Ready to Serve Charge (service charge which covers administrative and maintenance costs and is based on meter size):

Code Meter Quarterly
Rate
20 ¾" $  12.00
21  1" $  20.40
15 (flat rate, no meter) $175.00 per quarter

Sewer (flat rate)
Sewer rate increase effective November 16, 2009

Code Quarterly
Rate
50=Sewer
52=Sewer (Mobile/Manufactured homes)
$  77.21 per quarter
$  46.33 per quarter

 

Procedures for Final Bills

(Back to Top)

Final Water Bills

We must receive advance notice of a closing, as we need to schedule an appointment with the current homeowner to read the inside meter.  Please call our office at 248-625-8222 to schedule a final read.

If the seller will not be moving out of the home immediately after the closing, it should be determined, in advance, with the seller and purchaser as to the final date for the meter read.

We cannot get in the middle of who is responsible for a final bill.

Final Sewer Bills

We need a 24-48 hour notice to prepare the final sewer bill for the seller.

The final bill can be picked up at our office at 6050 Fleming's Lake Rd., mailed to a forwarding address or faxed.

 

 

 

 

 

 

 

Independence Township Signature
our community | our government | township departments | reference desk | employment | mailing list
search | site map | contact us | home
Site Design and Development by
Bringing the World to Your Corner of the World
This page last updated: May 01, 2011
All information ©2011 Charter Township of Independence
Click here for our Site Use Policy